Remodel Updates (Long Overdue)
I can't believe it's been over a month since I've posted about our remodel project! At this point, it looks like we're heading quickly towards the finish line. This post provides some detailed looks at the construction work. I'll do a separate post to show some of the "prettier" work that's happened recently (cabinet installation, tiles, etc.).
Mr. E hard at work with his new friend, "Mr. Chipper," removing the nasty adhesive that was left on the floor after we took up the grey tiles
This new beam (upper right) extends across the entire ceiling so that we could remove the wall between the kitchen and living room. The duct was put back into place alongside the beam.
Mr. E hard at work with his new friend, "Mr. Chipper," removing the nasty adhesive that was left on the floor after we took up the grey tiles
New recessed lighting in the living room and new drywall covering the holes that had been made to do the necessary new electrical work